Close Menu
    Facebook X (Twitter) Instagram
    Monday, September 14
    Facebook X (Twitter) Instagram YouTube
    Overlap Sports UGOverlap Sports UG
    • Home
    • Scores
    • Uganda
    • England
    • Championship
    • Rally
    Overlap Sports UGOverlap Sports UG
    Home»News»Namboole remodeling to cost $60M to fit CAF Standards
    News

    Namboole remodeling to cost $60M to fit CAF Standards

    March 30, 2026No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    David GOMBE

    The State Minister for Sport Peter Ogwang has confirmed that Phase two for Namboole Stadium remodeling will cost $60 million (about UGX.225 billion) to fit the CAF standards.

    Ogwang made the revelation while appearing on Nbs Sport on Monday and also assured that they are going to remodel the stadium to CAF Standards.

    “We are going to remodel namboole based on the CAF recommendation. The government has funds worth $60m for phase two. We sat with the contractor which is the UPDF engineering brigade and the supervisor, Ministry of works. We are having the contract cleared and once it is cleared we are going to hand it over to updf once again to have it remodeled to fit caf standards. Namboole design is of 1970 and today we are dealing with designs of 2024, 2025 and now 2026.” Stated Ogwang

    He also confirmed that over 8000 seats are to be added to the Stadium.

    “Around 8000 seats will be added at Namboole Stadium… it’s not going to be easy work. It’s easy to build a new stadium than remodeling.”

    Uganda, Kenya and Tanzania is set to host the 2027 edition of the Africa Cup of Nation but last month the CAF inspection team stated that the three nations were not ready to host the mega showpiece at the time.

    According to the CAF report, Mandela National Stadium requires major upgrading works, indicating it currently presents major compliance gaps with CAF Category 4 requirements.

    A large-scale upgrade project has been proposed, including:
    •Partial demolition of the West Stand;
    structural expansion;
    •roof replacement.
    However, the initial 15-month construction timeline is incompatible with AFCON 2027 delivery requirements. CAF has therefore recommended revising the upgrade strategy to:

    •Maximise use of the existing structural frame;
    •Reduce construction duration to target completion by December 2026.

    60M CAF cost fit Namboole remodeling Standards
    Share. Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email

    Related Posts

    Barry Ferguson-esque Dan Neil ‘ran the show’ for Rangers

    September 14, 2026

    Vipers bow out of CAF Champions league

    September 14, 2026

    Preston North End: Paul Heckingbottom sacked after poor start

    September 13, 2026
    Leave A Reply Cancel Reply

    Popular Posts
    April 9, 2026

    Tusker Lite Neon Run Rescheduled to May

    The Tusker Lite Neon Run has been pushed to May 8, 2026, giving runners more…

    February 27, 2026

    ‘Don’t know what the fuss was about’ – chaotic Palace season could end in glory

    The Conference League, Europe’s third-tier competition, is only in its fifth season, with two English…

    August 23, 2026

    Newcastle 2-2 Liverpol: Relief for Andoni Iraola but Liverpool have work to do

    This remains a Liverpool side offering more questions than answers. One significant question is the…

    March 1, 2026

    Buddo SS, Kitende bow out of Elite Championship

    Gladys ZAWEDDE Buddo SS and St Mary’s Kitende have lost their respective quarter final games…

    March 23, 2026

    Prem Rugby: Finn Russell prevails, Marcus Smith toils and Leicester tear it up

    Bonus points caught some flak at the end of the Six Nations.Had champions France drawn…

    Facebook X (Twitter) Instagram Pinterest
    • Home
    © 2026 - Overlap UG.

    Type above and press Enter to search. Press Esc to cancel.

    Ad Blocker Enabled!
    Ad Blocker Enabled!
    Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.